Photo Galleries
2008:
September,
July,
June,
April,
February,
January
2007:
October,
August,
June,
April
September 2008 Photo Gallery
Stack Outlet at Full Load
Operating Condition
Turbine Hall and
Substation
240 Tonnes per Hour
Circulating Fluidized Bed
Boiler Complex
Fuel Prep Building and
Boiler
Main Coal Supply
Conveyor to Existing and
Future Boilers
Coal Storage Facility
Coal Handling Area
Coal Testing Station
Coal Testing Laboratory
Fuel Supply Conveyor
Electrostatic Precipitator
and Ash Collection
Ash Sales
60MW Turbine Generator
60MW Turbine Generator
Turbine Hall Basement
Turbine Lube Oil Pumps
Oil & Chemical Injection
Steam and Boiler Water
Sampling
Central Control Room
Distributor Control System:
Turbine Generating
60.24 MW
Distributor Control System:
Boiler in Operation
Water Treatment Area
Substation
July 2008 Photo Gallery
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
YPPC Opening Ceremony
Ash Sales
Ash Loading
Diesel Storage
Fuel Storage & Handling
60MW Turbine Generator
Fuel Receiving
Control Room
Clear Stack Outlet at
Full Load Conditions
240t per hour Circulating
Fluidized Bed Boiler
June 2008 Photo Gallery
110 KV Sub Station
Boiler Combustion Air
System
Central Control Room
CFB Broiler
Coal Sampling and
Weighing Station
Electrostatic Precipitator -
Fly Ash Collection Hoopers
First 60MW Turbine
Generator
Ignition Oil and Pump
House
Infrastructure for the 2nd
60 MW Unit
Instrument Air Compressors
Kuwaitee Visitors at the
Coal Receving Area
Pneumatic Ash Conveying
System
Turbine Condenser
Water Treatment Plant
YongXing Power Plant
Front End Ash
Removal System
April 2008 Photo Gallery
YPPC
20 MW Hydro Power Plant
Administration Building
Dormitory
100kV Substation
Fly Ash Collection Hoopers
Control Room
Water Treatment Plant
Fuel Reclaim
Fuel Storage
Fuel Supply Conveyor
Lube Oil Tank & Pumps
Chemical Injection
Metering Pumps
Air Dryers
Transmitters Installation
Turbine Condenser
February 2008 Photo Gallery
Fuel Prep Building
and Boiler
Fuel Storage Facility
Turbine Hall and
Substation
Water Treatment Area
Substation
Turbine Generator
Boiler and Electronic
Precipitator
Side View of Power Plant
Front View of
Power Plant
Boiler Complex
January 2008 Photo Gallery